Skip to product information
Project Planning Dry-Erase Whiteboard 48" x 36"
$697.98
About This
- Magnetic Dry-Erase Surface – The design is permanently printed onto durable vinyl that won’t smudge, and is resistant to stains and ghosting—ensuring long-lasting visibility and a smooth writing surface
- Easy Installation – Includes mounting brackets and hardware for secure and hassle-free wall mounting
- Durable Aluminum Frame – 1" aluminum border paired with a 2.5" deep aluminum tray for convenient accessory storage
- Usable Writing Surface – Writing area measures 2" less than the board's total dimensions
- Please inspect your whiteboard upon arrival – If you notice any issues, please contact us through Amazon's Buyer-Seller Messaging system
Overview
- Brand : Creative Safety Supply
- Color : White
- Material : Aluminum, Metal, Vinyl
- Recommended Uses For Product : Office
- Mounting Type : Wall Mount